
We handle hacking and demolition for HDB, condo and landed renovations — from wall removal to tile hacking — with proper permits, safe work practices and full debris disposal.

Hacking is the first and most critical step in renovation. We follow HDB and BCA guidelines, protect structural integrity and manage the entire process from permits to debris disposal[reference:17].
From wall removal to tile hacking and disposal, we handle the full scope.

Hacking involves structural, safety and regulatory considerations. We manage these carefully.
Identifying non-structural vs structural walls
HDB permit and renovation rules compliance
Dust and noise control during works
Safe termination of electrical and plumbing lines
Debris removal and approved disposal
Protecting retained surfaces during hacking
Facing any of these? We fix it right the first time.

Trusted TeamQuality guaranteed
We bring experience, safety compliance and proper project management to every hacking job.
We follow HDB and BCA guidelines strictly.
HDB hacking pricing is typically based on the scope of work. Kitchen hacking starts at $1,500, toilet hacking at $900, and full-flat hacking ranges from $2,800 for a 3-room to $4,600 for an executive maisonette[reference:18]. Prices are subject to change based on size and scope.
HDB Hacking Scope | Indicative Price (SGD) |
|---|---|
Kitchen Hacking | $1,500 |
Toilet Hacking | $900 |
Kitchen + 2 Toilets | $2,200 |
3-Room Flat Hacking | $2,800 |
4-Room Flat Hacking | $3,200 |
5-Room Flat Hacking | $3,800 |
Executive Apartment | $4,200 |
Executive Maisonette | $4,600 |
A structured four-step process for safe, compliant hacking works.
A snapshot of renovation hacking projects we've completed across Singapore.
Answers to common questions about hacking and demolition in Singapore.
HDB hacking starts at $1,500 for a kitchen and $900 for a toilet. Full-flat hacking ranges from $2,800 for a 3-room to $4,600 for an executive maisonette[reference:19]. Final pricing depends on the scope and size of the unit.
Yes — HDB flats require a renovation permit before hacking works can begin. For condominiums, MCST approval is needed. We assist with the necessary applications[reference:20].
No — structural (load-bearing) walls cannot be hacked as they affect building stability. We review the floor plan and advise on which walls can be safely removed[reference:21].
Hacking works typically take 3–5 days for a standard HDB flat, depending on the extent of demolition. We adhere to approved renovation hours to minimise disturbance to neighbours[reference:22].
Yes — our hacking packages include clearing and disposal of all renovation debris at approved dumping grounds[reference:23].
Yes — we handle hacking and demolition for HDB flats, condominiums and landed properties.

6+ SolutionsTailored to your space
We help with HDB renovation permit applications.
Electrical and plumbing lines safely handled.
Debris removed and disposed at approved grounds.
Skilled teams for residential demolition works.